Case Studies

Horsebox rebuild

The tail lift and rear corner pillars were removed and the existing side door panelled in.

New corner pillars, skirt panels and a hydraulic rear horse ramp were manufactured and fitted.

New roof covering, roof fans, coving and LED lighting was fitted. New stock board, rubber matting and GRP loading gates were manufactured and fitted.

Aluminium plank flooring was fabricated and fitted along with aluminium to the walls.

New tack locker boxes and doors and stainless steel partitions fabricated and fitted.

The lorry was then resprayed at our sister company Spraytek Ltd.

 

We are recruiting! We have an opening for a HGV technician- Please call Chris on 01489 789655 for more details

We have an opening for a HGV technician – Please call Chris on 01489 789655 for more details

WordPress Video Lightbox Plugin